After a few rainy weeks when we thought Sims Hill was going to turn into an aquatic wonderland, things are finally starting to dry out. The Bristol area received 273mm (nearly 1 foot) of rain in 3 weeks and was officially the wettest April in over 100 years! Needless to say this had a noticeable impact on the growth of plants and the ability to cultivate and tend to veg already planted. On the plus side we have filled our new pond (approx 60,000 litres in 2 days) and have a really good understanding of water movement through the site. The potential to catch and store water is truly epic and we can potentially store enough rain water to irrigate all our soon to be bought poly tunnels.
Our successful grant applications to Bristol Green Capitol and S. Glos mean that we are in a position to invest in two large tunnels (pending planning permission) plus all the fencing and crop protection necessary to grow to the capacity of the field which we estimate to be between 80 – 100 full shares.

